RICHARD SHEEHAN • PAGE 2
• richardsheehan1@hotmail.com
PROFESSIONAL EXPERIENCE
-Continued-
Field Technician – Airwave Telecom (06/2012 –
03/2013 Austin, TX)
Conducted site surveys for the T-Mobile
Modernization project in Austin and San Antonio Texas. In Houston Texas our
company was subcontracted by Goodman Networks. I performed Pre-Construction
walks with NSN and T-Mobile for their 2G and 3G Modernization and LTE
projects. Also worked with the site builds to add new Nokia Siemens radios,
run dc cables, fiber jumpers, T1’s, LMU cables and ran conduits between the
BBU’s, covp’s, FCOA, Ultrasite and Telect cabinets as required. This includes
working with the installation teams and tower crew ground teams on the site
builds for the installation of hybrid fiber cables. Received Nokia
certification for C-RRU Rooftop Ground level 1,
Certification number 001ADRR0000209.
Field Technician - Oxford International (03/2012 –
06/2012 Beverly, MA)
Primary
duties in the Cricket Tennessee market were to pull cat 5 cables to add EVDO
circuits and terminate them to the Lucent BTS equipment from the Demarcation
point and test for telco connectivity. Update and add grounding for each T1
as needed. Once the Cricket work in Tennessee was completed at the end of
April, I was recommended by the Cricket team in Nashville for the Cricket
Equipment migration work in Houston Texas.
·
Other tasks required have been to troubleshoot BTS issues
and replace modules as required.
·
Install and power up Cisco routers in the Nortel Metrocell
BTS equipment and/or move the routers and setup in the new Ericsson cabinets
for the Houston Market.
·
Load the script files into the Cisco MWR2941 Mobile
Wireless Routers.
·
Add Dom cards into the Nortel Metrocell BTS as part of the
expansion process in the Houston market.
Field Technician - Oxford International (10/2011 –
11/2011 Beverly MA)
Contributed
analytical and critical thinking skills in facilitating swing test sites for
cutover in Verizon’s New Mexico markets. Effectively wired-up DSX cross
connect panels to ready sites for cutover and test calls, as well as
verifying sites are ready for cutover.
·
Oversaw the performance of cutover sites to effectively
integrate them into the New Mexico system.
·
Successfully evaluated, resolved, and loaded files onto
the Motorola 4812 BTS and the high capacity UBS’s, further illustrating
technical expertise.
TechUSA, Field Technician (9/2010-1/2011 Charlotte,
NC)
Prioritized,
planned, and coordinated multiple simultaneous projects to maximize
efficiency and achieve critical timelines. Utilized the Motorola 4812 and UBS
equipment for Carrier additions and Frame additions.
· Diligently
reviewed and installed BTS cards, backplanes, CLPA’s and fans, as well as FTP
into the BTS, as well as loading Spa files onto the EVDO cards.
· Effectively
loaded Cisco 1900-27 routers in support of completing the integration
process.
Thailand Sabbatical - Walen School of Language
(9/2009-9/2010 Bangkok, Thailand)
I did not work or earn income during this time
period. Developed and applied a strong understanding of Thai language and
culture. Proactively assisted a Thai farmer harvest his rice crop and
supported Buddhist Monks in moving boulders in order to construct WAT (Temple)
in the mountains.
Field Technician - Bearcom (12/2008-7/2009 Chicago,
IL)
Played
a key role in installing Motorola Canopy Broadband radio systems. Directed
system reviews, identified and addressed existing and potential issues, and
create proactive repairs, upgrades, and enhancements for optimal
results.
·
Diligently assessed and resolved a hospital paging system
at the Hines VA hospital in Chicago.
·
Proficiently installed and programmed two way radio
systems from multiple equipment manufactures, CCTV camera systems including
wireless and PTZ cameras, and Repeaters and Radios for Wind Farm Facilities
in Kansas, Indiana, and Illinois.
-Continued-
RICHARD SHEEHAN • PAGE 3
• richardsheehan1@hotmail.com
PROFESSIONAL EXPERIENCE
-Continued-
Construction Manager - Civil Solutions Incorporated
(2/2008 – 8/2008 New York, NY)
Trained,
mentored, and led a cross-functional team of Construction Managers for
T-Mobile Miami Project, with a strong focus on optimizing productivity and
performance.
· Performed
a broad range of activities, including authorizing pickups, managing Field
Managers’ site visits and field activities, and handling logistics for
project construction activities.
· Evaluated
a broad range of RF Data Sheets to prepare for site build activity
Construction Manager / Manager - FMHC Corporation
(9/2006-12/2007 Chicago, IL)
As
the Construction Manager for the Baltimore / Washington DC Sprint 4G project,
demonstrated strong leadership skills in managing construction teams.
Collaboratively worked with the contractor’s managers daily, further
illustrating communication and relationship building abilities.
· Evaluated
site walk packages, assessed whether space was available for additional BTS
equipment, and facilitated BOM’S for equipment and materials for the site
build activity.
· Steered
the daily operations of the Site Acquisition and Construction Management
teams, including billing and staffing, hiring contractors, and scheduling
activities.
Implementation Manager - Goodman Networks (5/2005-9/2006
Plano, TX)
Served
as the Project Manager for the implementation of True Position E911 LMU
equipment on Cingular projects in Connecticut, New York, Massachusetts,
Pennsylvania, Florida, Maryland, and California. Successfully built and
steered multiple teams to maximize performance in consistently completing
projects on time and within budget in a fast-paced, time-sensitive
environment requiring superior planning, organization, and leadership skills.
· Successfully
managed teams in field activities for multiple projects in the Northeast.
· Designed,
developed, and implemented key initiatives to reduce the cost of the projects
while maintaining project schedules.
· Led the
installation scheduling and warehousing activities including the release of
equipment to the 15+ teams on a daily basis and maintained inventory control
as well.
Field Supervisor - Kineticom (3/2004-2/2005 San
Diego, CA)
Played
a key role as the Field Installation Supervisor for the implementation of
True Position E911 LMU equipment. Developed a solution to program LMU’s in a
hotel conference room using a Lab Power supply. Directly handled all phases
of team scheduling and site activities. Performed extensive QA inspections of
the work in those markets and delivered equipment to the teams from the
warehouse in Orange County, further exhibiting sharp attention to detail.
· Provided
support for projects in Puerto Rico, Georgia, Alabama, Louisiana, San Diego
county, Imperial county and San Bernardino county, California.
· Led daily
meetings with the crews at the storage facility to logout and distribute
materials accordingly.
Cellular Field Technician - Glotel (8/2003 – 10/2003
Atlanta, GA)
As
a Field Technician for Alltel in Albany Georgia, developed and applied strong
technical proficiencies in conducting routine maintenance of cell sites as
well as conducting site audits, including verifying site layouts and
equipment.
· Tracked
and managed the tower lights and ensured proper functioning.
-Continued-
RICHARD SHEEHAN • PAGE 4
• richardsheehan1@hotmail.com
PROFESSIONAL EXPERIENCE
-Continued-
System Engineer - TWS International (8/1997-2/2002 Alpharetta, GA)
Supported
all facets of system engineering for a diverse range of projects, including
Ericsson, Nortel, Motorola and Siemens equipment. Developed and updated
spreadsheets and collaborated with civil engineers regarding cell site
selection and construction.
· As a
Project Manager, oversaw QA of the sites by conducting site walks as well as
going with the Ericsson and Siemens field teams for the acceptance testing of
the sites.
· Led a team
of engineers to collect documentation for archiving site drawings, leases and
zoning information and coordinating the work activities of the Siemens and
Ericsson teams in the field.
Career Note:
Additional experience as a Field Engineer / System Engineer for
Motorola Inc.
EDUCATION & PROFESSIONAL DEVELOPMENT
·
Diploma - Omega School of
Communications, Chicago, Illinois
·
Sitemaster Line Sweep
·
Air Magnet 802.11 Analyzer
·
Cisco CCNA
·
Project Management Professional
·
Certified Wireless Network Associate
·
Map Info Pro
·
Motorola BTS100NE for SC4812 Series BTS
·
UBS100NE for Motorola Universal Base Station (UBS)
·
Motorola
UBS102-OWBT-100510 Webinar for 4812 and UBS BTS
·
Motorola R56 Training
·
Motorola Centracom Gold Elite Console Systems
·
ABC Tele training Workshop – Practical Telecommunication
System Grounding
·
Motorola EMX 2500 Operations and Maintenance
·
DSC EMX 2500 SS7 Translations
·
Northern Telecom DMS MTX Basic Maintenance
·
Northern Telecom DMS MTX Advanced Maintenance
·
Motorola CDMA: IS-95 Implementation & Operation
·
Motorola CDMA
Call Processing
·
ITT Telecom D448/T1 Maintenance
·
Scientific Radio Systems Inc. Training on the
Installation, Operation and Maintenance of the HF Frequency SR-210 SSB
Transceiver, SR-204 SSB Transceiver, SR-110 1KW Power Amplifier, SR-808
Selective Call Unit and Associated Antenna Couplers
·
Metawave Fundamentals for SpotLight 2000 Smart Antenna
Systems
·
AN/SSR-1 Fleet Satellite Broadcast Receiver Maintenance
CERTIFICATIONS
·
CompTia
Project + 7/14/2003
·
OSHA 10 hour Construction Safety Training 4/22/2013
·
OSHA 30 hour Construction Safety Training 10/12/2008
·
Anritsu Sitemaster line sweep 8/31/09
·
NSN – C-RRU Rooftop and Ground Level 1 ID
001ADRR0000209 9/15/2012
LICENSES
FCC General Radio Telephone; FCC General Class Radio
Telephone